Skip to main content
Almost an Architect
Current page: NKBA Kitchen 10
StandardRecommended

Waste receptacle

NKBA Kitchen 10

Description

Provide at least one waste receptacle (or pull-out trash) within reach of the prep zone — typically integrated into a base cabinet adjacent to the sink.

Why this exists

Trash that's far from prep travels through the kitchen on cutting boards and ends up on the floor.

Categories

Kitchen

Applies to

  • Room types: kitchen

Source

NKBAno manifest entry
Kitchen Planning Guidelines (2024)
Section: Guideline 10
Published 2024-01-01 · last verified 2026-05-09

Solver enforcement

Browsable only — the solver does not currently enforce this directive (no spec-level data to check against). This entry exists so the architect personas can cite it in conversation and the user can read what the rule says.

Related directives

Last reviewed 2026-05-09.